290 watt solar modules
54 cells 290W solar modules and off grid solar system
price

US $0.20 - US $0.35 / watts

SP290-54M
FOB, EXW, CIF, DDP
290 watts
1GWwatts / Year
CHINA
14Day
Power Tolerance 0~+3%
12 years production warranty, 25 years linear warranty.
12-year: 90.7% power output, 25-year: 80.2% power output.
Quantity

290W Mono-Crystalline Solar Module

Sunpro Power is an integarted photovoltaic manufacturer focusing on solar modules and solar systems since 2008, with strong technical support, scientific production management and strict quality control, power up to 540W. Our factory is basied in china, equiped with fully automatic production lines at 800MW annual capacity.

Production Specification

Electrical parameters at standard test conditions  (STC:AM=1.5, 1000W/m2, Cells Temperature 25°C)

Model type

290W

Max power

290W

Max Power voltage(Vmp)

30V

Max Power current(Imp)

9.67A

Open circuit voltage(Voc)

36.8V

Short circuit current(Isc)

10.23A

Module Efficiency(%)

18.63%

Max system voltage

DC 1500V(TUV)/DC 1000V(TUV)

Maximum Series Fuse Rating

16A

Mechanical Data

Dimensions

1500x1002x35mm

Weight

16.1kg

Front glass

3.2mm tempered glass

Output cables

4mm² Symmetrical lengths 1100mm

Connectors

MC4 compatible IP68

Cell type

Mono-Crystalline Silicon

Connectors

Mc4 compatible IP68

Number of cells

54 cells

Our Factory
 

 54 cells 290W solar modules and off grid solar system


Our main market

In the past decades,Sunpro Power built a wide sales network in global market which covers more than 68 countries, our major target markets are Europe, USA, Southeast Asia, America, Australia, Africa, etc, Our overseas projects involves State grid solar power plant, household solar system, outside portable solar system,etc.

FAQ

1.Q:Could you produce 166mm cell?
A:Yes,we do.
2.Q:Do you have stock warehouse in EU market?
A:Yes, we have. We set warehouse in Rotterdam and Poland to keep regular customs clearance stock solar panels.
3.Q:May i have a piece of sample to check the quality?
A:Welcome to place the testing order to check the quality or for testing.
4.Q:How about the delivery time?
A:Generally, the order takes 15-20 days after receiving your payment.
The specific delivery time depends on the items and the order quantity.
5.Q:Where is the port of loading?
A:Ningbo or Shanghai
6.Q:Can you do OEM?
A:Yes, we are welcome to do OEM for our clients.
7.Q:Could we be your agent or distributor?
A:Yes, we do.