US $0.20 - US $0.35 / watts
● Power Source Type: Solar-Powered
●Guaranteed positive output tolerance (0-3%); withstands high winds (2400Pa) and snow loads (5400Pa)
325W 120cells half cut Monocrystalline Solar Panel
Half cut cells are a newer technique for manufacturing solar modules that uses either mono-crystalline or polycrystalline cells. PERC high efficiency cells which we use in our half cut mono panel have no color difference and outstanding appearance. Silver and black color frame are optional which are Easy to transport and install.
Product Specifification
Typical Type | 325W |
Max power(Pmax) | 325 |
Max power voltage(Vmp) | 33.6 |
Max power current(Imp) | 9.69 |
Open circuit voltage(Voc) | 40.4 |
Short circuit current(Isc) | 10.3 |
Module efficiency(%) | 19.25 |
Max system voltage | DC 1500V/DC 1000V |
Maxmium Series Fuse Rating | 20A |
Mechanical Data
Item | Specification |
Dimensions | 1685*1002*35mm |
Front glass | 3.2mm tempered glass |
Output cable | 4mm² symmetrical lengths 1100mm |
Connectors | MC4 compatible IP68 |
Cell Type | Mono-Crystalline PERC Half-Cell 9BB 79.375x158.75mm |
Number of cells | 120 cells |
| PERC high efficiency cells No color difference, outstanding appearance. |
| Low iron tempered embossed glass. 3.2mm thickness, enhance the impact resistance of modules. Self- cleaning function |
| Silver and black color frame are optional. Strong corrosion and oxidation resistance. Strong strength and firmness. Easy to transport and install. |
| Enhance the light transmission of the components Enhance the high resistance Bonding solar cells, tempered glass, TPT together, with a certain bond strength. |
Our factory

FAQ
1.Q:Could you produce 166mm cell?
A:Yes,we do.
2.Q:Do you have stock warehouse in EU market?
A:Yes, we have. We set warehouse in Rotterdam and Poland to keep regular customs clearance stock solar panels.
3.Q:May i have a piece of sample to check the quality?
A:Welcome to place the testing order to check the quality or for testing.
4.Q:How about the delivery time?
A:Generally, the order takes 15-20 days after receiving your payment.
The specific delivery time depends on the items and the order quantity.
5.Q:Where is the port of loading?
A:Ningbo or Shanghai
6.Q:Can you do OEM?
A:Yes, we are welcome to do OEM for our clients.
7.Q:Could we be your agent or distributor?
A:Yes, we do.



